01 / Regime
Torntle
) p13) continuous, p14) intermittent, p12) as demand for line pressure.
Home / Divisions/ Compressed air
Division ยท Compressor / Air
) high-pressure p12), ventilation p13) screw p14) piston p14, packages 5-15 HP, RF dryers and banks p19). Each model with technical information sheet America (60 Hz) and Europe (50 Hz) - guiding values for preliminary projects.
Technical criterion
The correct series prevents overdimensioning the engine and end pressure drops. AM / EU change Hz and tension and selection logic is the same.
01 / Regime
) p13) continuous, p14) intermittent, p12) as demand for line pressure.
02 / Quality
RF and filtration by area according to paint, blow or tool.
03 / demand
Varier or two cascades with an irregular profile.
04 / Red
Proper ร ring reduces ฮP and p19 โณ close to place.
05 / Market
60 Hz / 220-480 V AM vs. 50 Hz / 400 V EU - sheets per model below.
Divisional families
) p12), p13), p14) and ppppg packages. Each family opens its variants.

Compressor) p12) for blowing, testing and demand high pressure at plant.

Loan screw for continuous rolling: p13, 7, 11 / 15 / 22 kW and VSD.

Tank piston for intermittent demand of workshop and lab oil-less.

Fountain + tank + p19 โณ + dryer as per pack for quick mounting.
Series and models
Each card includes technical information sheet America and Europe (guidance). No repeated photos on this page.

ACG-30
high pressure) p12) for blow and test.
Guidance values. The final tension depends on the place.
Guidance values. The final tension depends on the place.

ACG-40
been built up with an associated drying bar.
High pressure: check local network ร and safety valves.
High pressure: check local network ร and safety valves.

ACS-7
Torntle) p13) 7 workshop with soundproof cabin.
Ideal bay 2-4 jobs with p19 been per area.
Ideal bay 2-4 jobs with p19 been per area.

ACS-11
Tornillo 11 kW for several bay network.
Dimension by simultaneous tools.
Dimension by simultaneous tools.

ACS-15
Speed variable as required all
VSD: confirm local harmonies and cabling.
VSD: confirm local harmonies and cabling.

ACS-22
Ground screw with cold dryer.
Machine room: ventilation and drainage of condensates.
Machine room: ventilation and drainage of condensates.

PCT-270
Stamp and tank 270 L for intermittent demand.
Workshop with peaks and does not replace continuous screw.
Workshop with peaks and does not replace continuous screw.

PCT-500
Double piston / tank 500 L.
Check anchor and wall distance for cooling.
Check anchor and wall distance for cooling.

PCT-OIL
No oil for labs and fine paint.
Ground oil: ideal water cabin and lab.
Ground oil: ideal water cabin and lab.

HP-5
Key in hand 5 HP + tank and) p19).
Promotional pack and an optional dryer with quality.
Promotional pack and an optional dryer with quality.

HP-7
7.5 HP with dryer and line filters.
A good cost / capacity balance for light body.
A good cost / capacity balance for light body.

HP-10
10 HP for medium workshop.
Confirm machine / tool simultaneity factor.
Confirm machine / tool simultaneity factor.

HP-15
The light and high and Rheand with a Red with a Rast.
Ring reduces sympsis and tipstick.
Ring reduces sympsis and tipstick.

DRY-RF
Section 3
It's not ISO certification and final class is valid in project.
It's not ISO certification and final class is valid in project.

FRL-BANK
Filtering / regulating / lubrication by area.
AM shows bar and pSI; EU prioritizes bar.
AM shows bar and pSI; EU prioritizes bar.

AIR-EU
Configure type of EU / DE compressor room.
Section reference DE / AT; adapt to local regulations.
Section reference DE / AT; adapt to local regulations.
Application scenarios
Flow and bar guidance - closed as a proposal with local data.
Scenario A
Reg.
Scenario B
) p13) 15 VSD + p12) 30 for blow.
Scenario C
nationals)
Contact
We have dimensions and treatment. Orientation values AM (60 Hz) / EU (50 Hz).
8020) Graz), p36) 8010), Austria